You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Trotoar Jl Raya Gereja Tugu Rampung
....
photo Anita Karyati - Beritajakarta.id

Sidewalk Repairs on Jalan Raya Gereja Tugu Completed

The Cilincing Sub-district Bina Marga Executing Unit, North Jakarta has completed repairs to the sidewalk on Jalan Raya Gereja Tugu, RT 08/06, Semper Barat Urban Village, Cilincing Sub-dstrict.

 This work involves five personnel

Cilincing Sub-district Bina Marga Executing Unit Head, Hartanto said the repairs were aimed at restoring the sidewalk's function to be comfortable and safe for pedestrians.

"It is done by replacing the old paving blocks with new ones. Then, we also repair the sheet pile that collapsed due to tree roots," he expressed, Friday (9/27).

Sidewalk Arrangement on Jalan Haji Adam Malik Completed

He explained the sidewalk repairs of 50 meters long and 1.1 meters wide were started from September 23 to 25, 2024.

"This work involves five personnel," he explained.

He encouraged the residents maintain the sidewalk by taking care of it and not using it for selling.

"If maintained together, the sidewalk becomes neater and more organized. Pedestrian safety and comfort are a priority," he uttered.

The repair above received appreciation from one of the SMAN 52 students, Nabila Ria (16).

"I always go to and from school by crossing this sidewalk. After it is tidied up, it will certainly increase the safety and comfort of pedestrians, especially since this road is often used by heavy vehicles," she admitted.

Linked News
Popular News indeks
  1. Fire Burns Resident House in Duren Sawit

    access_time26-09-2024 remove_red_eye777 personNurito
  2. 24 Teams Participate S. Jakarta Education Sub-agency Sepak Takraw Cup

    access_time25-09-2024 remove_red_eye581 personTiyo Surya Sakti
  3. Monas Bus Stop Officially Serves Route 14A Monas - JIS

    access_time30-09-2024 remove_red_eye556 personAldi Geri Lumban Tobing
  4. Fire of Two Ships in Muara Baru Handled

    access_time25-09-2024 remove_red_eye547 personAnita Karyati
  5. Repair of Sheet Piles on Jalan Pedurenan Masjid IV Completed

    access_time30-09-2024 remove_red_eye464 personTiyo Surya Sakti